WWW.STOREITCOLD.COM
SUPPORT@STOREITCOLD.COM
42
2019 © Store It Cold, LLC. Rev 2019-04A All Rights Reserved.
CEILING INSULATION
A. FOR COOLERS WITH NO OPTIONAL HANGING JOISTS (with or without roof)
• Cut and fit insulation panels to go OVER the ceiling joists (not in between!) just as explained
in the “WALLS INSULATION” section. Leave the seams in between panels running parallel to
the door and back wall. This way the ceiling panels will “sit” on the wall insulation- once it is
installed. The wall insulation will provide extra support to hold the ceiling panels.
• Using a combination of proper heavy-duty adhesive (like liquid Nails) and screws (with
plastic caps) install the first layer of insulation to the ceiling.
• Using spray foam and HVAC tape seal all joints and gaps on the first insulation layer. See
how-to tips on page 49 to 51
• After allowing sufficient time for the adhesive to fully cure on the first layer, cut and dry-fit a
second layer of insulation to go over the first one. NOTE: DO NOT match the seams of your
first layer. Install your second layer staggering the seams when compared to the first layer.