EasyManua.ls Logo

Store It Cold CoolBot PRO - Page 43

Store It Cold CoolBot PRO
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WWW.STOREITCOLD.COM
SUPPORT@STOREITCOLD.COM
43
2019 © Store It Cold, LLC. Rev 2019-04A All Rights Reserved.
Apply heavy duty adhesive (like Liquid Nails) generously to both layers of insulation and glue
the second layer of insulation.
Apply pressure on your panels evenly and all around to ensure proper contact. As done with
the first layer of insulation, fill all gaps with spray foam insulation and tape all joints with 2-
1/2" wide foil HVAC tape
It is HIGHLY recommended to brace your ceiling while the adhesive dries and cures to
ensure that your panels are properly installed and will not sag or fall down.
Proceed to page 47 (WALLS INSULATION)

Other manuals for Store It Cold CoolBot PRO

Related product manuals