EasyManua.ls Logo

Stratus ftServer 2600 - Disk Drive Troubleshooting

Stratus ftServer 2600
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Planning for Cables
Space Planning 3-3
Planning for Cables
To accommodate cables from your system, make sure to provide:
One or two telephone lines:
One telephone line for use when calling for service
One telephone line for the ASN modem, if used
Ethernet jacks, switches, or hubs, as needed
Two electrically separate grounded AC wall outlets, or a UPS and a wall outlet,
within reach of the power cords from the system or PDUs, and additional outlets for
any components that do not connect to a PDU
For optional components, AC wall outlets within reach of the power cords from the
components, or use PDUs
Make sure that cables you plan to connect to the system are long enough to reach
between the system and external components or connections. For information about
specific cables and power cords, see the following:
“Power Cord Summary” on page 2-13
Chapter 4, “Communications Line Planning”
“Monitor Requirements” on page 6-5
Stratus ftServer Systems: Peripherals Site Planning Guide (R582) for information
about cable lengths for peripheral components

Table of Contents