Studer Innotec SA
Quick guide RCC-02/-03
16 V 6.1.0 Quick guide
Xtender parameter description
Xtender watchdog enabled (SCOM)
Xtender watchdog delay (SCOM)
Parameters saved in flash memory
Reset of all the inverters
Multi inverters independents. Need reset {1468}
Battery cycle synchronized by the master
Allow slaves standby in multi-Xtender system
Splitphase: L2 with 180 degrees phaseshift
Minigrid with shared battery energy
Is the central inverter in distributed minigrid
Battery voltage target for forced grid feeding
Forced grid feeding start time
Forced grid feeding stop time
Use of the defined phase shift curve for injection
Cos phi at the power defined by param {1613}
Power of the second cos phi point in % of Pnom
ARN4105 frequency control enabled
Delta from user frequency to start derating
Delta from user frequency to reach 100% derating
6.3 CONFIGURATION OF THE BSP (BATTERY STATUS PROCESSOR)
BSP parameter description
Nominal discharge duration (C-rating)