EasyManua.ls Logo

Stulz UltraWater 120 basic - Connecting the Water Supply (A)

Stulz UltraWater 120 basic
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STULZ UltraWater 3-stage reverse osmosis system SUW Installation
© STULZ GmbH, Hamburg
-
27
-
1
Connect the supplied 3/4" untreated water con-
nection to a cold water tap.
Warning: The untreated water connection may be
damaged if overtightened.
2
Connect the hose (black) to the untreated water
connection and connection (A) of the SUW.
The hose is available as an accessory (1220947).
3
To disassemble, squeeze the clamping sleeve and
pull off the hose.
7.2.4. Connecting the water supply (A)
To connect the supplied pressure hoses, cut the ends of the hoses straight using a sharp pipe cutter.
The components of the supplied connection material are as follows:
• Connecting hose 6 mm (black) • 3/4" untreated water connection
-
8
-
© STULZ GmbH, Hamburg
-
8
-
1.3 Lieferumfang
Wasserhahn
12 Liter Wasserspeicher
Gehäuseschüssel
Ventil
Zuleitung
Drainageanschluss /
Abflussventil Brauchwasser
Wasseranschlussadapter
Kugelventil
Wasserspeicher
UV-RöhreVerbindungsschlauch
Proceed as follows to connect the water supply:
Hose
Hose
Clamping sleeve
Untreated
water con-
nection
Note:
Take the necessary precautions at the
installation site for all other connections.
Note:
During installation, the reverse osmosis system must be separated from the drinking wa-
ter mains by a backow preventer.

Table of Contents

Related product manuals