Assembly/Playhouse (continue
d)
From inside, secure l
eft
playhouse
wa
ll
(P3)
and right
playhouse
wa
ll (P2)
to
si
de
base fr
ame
with pan head
screws
(F11).
Secure l
eft
side
of
p re-assembled p layhouse
gab
le
to
angle
support
bracket (M9)
on
l
eft
with pan head
sc
r
ews
(F10).
Note: Align holes in bracket with screw indicators
on
gable.
53
Secure right side of pre-assembled playhouse
gab
le
to
ang
le
support
bracket (M
9)
on right with pan head
sc
r
ews
(
F1
0)
.
Note: Align holes in bracket with screw indicators on
gable.
Attach
ang
le
suppo
rt
bracket (M9) to
ms
1
de
of
post
(W1 )
with pan head screws (F10).