EasyManua.ls Logo

Suncast WRP7000 - Page 88

Suncast WRP7000
92 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Meijer.com
Final Assembly/Anchoring Play Set {continued)
In
the four places shown
on
previous page, drive
anchors
(A9)
14-112
" into ground. Check to
be
sure
there are
no
sharp edges (burrs)
on
anchors caused
by pounding. If burrs occur, sand edges smooth. It is
recommended to touch
up
any exposed metal with
an
outdoor grade paint.
Be
careful
not
to hit wood post
when driving anchors into ground.
Note:
Make
sure
stake part
of
anchor
IS
flush against
ins1de
of
wood
brace.
Hole in anchor flange should
be
centered between
T-nuts. Mo
unt
anchors to posts using lag screw (
F7
)
and
lock washer
(F8
). Repeat for remaining three anchors.
IMPORTANT:
Check
regularly
for
any
damage
or
excessive
corrosion/deterioration
and
that
anchors
are
not
loose. Play
set
must
be
firmly
anchored
to
ground
during
use.
If
not,
stop
using
play
set
and
tighten
or
replace
anchors
as
necessary.

Related product manuals