3 Mechanical Installation
3.1 Inspection before Installation
Check the scope of delivery for completeness according to the packing list. The
following items should be included:
IItteemm
DDeessccrriippttiioonn SSuumm
A COM100 1
B
Documents, including certificate, warranty
card, delivery inspection report, user manual,
etc.
1
C
Keys
2
D
M10 hexagon bolt assembly, used for wall-
mounted installation and floor-mounted
installation
4
E
M4x25 bolt, used for fixing antenna
1
F
M6x14 bolt assembly, used for fixing external
PE point
1
The device is carefully tested and inspected before delivery, but damage may
be caused during shipping. Therefore, inspect the device before installation. If
there any damage, contact the forwarding company or SUNGROW.