GD_202011_RT Series_3-Phase Hybrid Inverter Commissioning Guide_V1.0 Page 5 of 11
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our services, changes to this document may occur without notice.
2.3. Connect PV DC Connector
Connect PV DC to the MC4 connectors (Max 12.5A per string)
2.4. Connect Battery DC Connector
Connect Battery DC using the supplied Sunclix connectors and connect to the battery
terminals (See specific instructions from battery manufacturers).
2.5. Connect Energy Meter
Connect Energy Meter and battery Com cables to the multiplug.