EasyManua.ls Logo

SunStar SPS/E-BS1201H - Page 34

SunStar SPS/E-BS1201H
49 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
34
(9) Testing Auxiliary Input
1. Run the Machine TEST and then press
and to display “t-08.”
2. Press .
3. Relevant lamps will be turned on according to the 8
auxiliary input signals (J9 on the digital circuit board).
4. Press to end the test.
CAUTION
Inputting air pressure reduction only applies to
pneumatic type.
SELECT
READY
–/BACK
+/FORWARD
Aux8 input
Aux7 input
Aux6 input
Aux5 input
Aux4 input
Aux3 input
Aux2 input
Inputting the
external convering
of function key
(10) Clamp motor motion test
1. Run the Machine TEST and then press
and to display “t-09” .
2. Press .
3. Press to set the delay times for clamp moving
up and down. Use and keys
to change the delay time.
4. Press to end the test.
RESET
–/BACK+/FORWARD
SELECT
READY
–/BACK
+/FORWARD
Press pedal
Delay setup when the clamp
ascends
Delay setup when the clamp
descends

Related product manuals