52
Machine lifting operation
Set work equipment to the sprocket side.
Extend arm cylinder and bucket cylinder to
their end of stroke, operate boom cylinder and
lower the work equipment to the ground.
Stop the engine, remove the key and lock cab
doors and windows securely.
Use steel rope and support rod with sufficient
length to keep them not to hit machine during
lifting operation. Cover steel rope or rod with
protective material to avoid damages to
machine if necessary.
Put steel ropes through the place between the
first and second track rollers on both side of
the machine.
Adjust steel rope to keep the lifting angle
within 30 to 40°.
Lifting the machine gradually, check that it’s
balanced. Make sure to keep machine at level,
otherwise re-adjust steel rope until it’s at level.