EasyManua.ls Logo

Survision Micropak 3 - Default Chapter; Table of Contents

Survision Micropak 3
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1. Installation location
1.1 - Possible installation locations
1.2 - General installation rules
1.3 - Specic installation rules for car-parks and for normal toll installation when
reading from the front
1.4 - Specic rules for ceiling installation when reading from the front
1.5 - Specic rules for installations in car-parks and normal toll installations
when reading from the rear
2. Assembly
2.1- Assembly and power supply of the NANOPAK Totem
2.1.1 - Assembly procedure with weak electric current
2.1.2 - Assembly procedure with strong electric current
2.1.3 - Installation procedure for totems assembled by SURVISION in factory
2.2 - Assembly of MICROPAK
2.2.1 - Characteristics of the MICROPAK
2.2.2 - Attachment of the support bracket to the wall using the xation kit
with angular displacement provided by SURVISION
2.2.3 - Fixation of support bracket to the ceiling using the xation kit with
anglular displacement provided by SURVISION
2.2.4 - Assembly of AMPHENOL connector
2.2.5 - Diagram of MICROPAK power supply connector
2.3 - Assembly of VISIPAK
2.3.1 - VISIPAK features
2.3.2 - Support bracket installation procedure
2.3.3 - Particular case of SURVISION graduated angle support bracket for
VISIPAK
2.3.4 - Assembly of AMPHENOL connector for VISIPAK
2.3.5 - Assembly of the visor
3. Aiming/Settings adjustment
3.1 - Procedure of adjustment of SURVISION cameras
4. Maintenance
4.1 - Preventative maintenance
4.2 - Firmware update
4.3 - Curative maintenance
4.4 -RMA procedure
Table of Contents

Related product manuals