EasyManua.ls Logo

Suzuki LT-Z90 - Engine Remounting

Suzuki LT-Z90
258 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGINE 3-7
ENGINE REMOUNTING
Remounting the engine in the reverse order of engine removal. Pay attention to the following points:
NOTE:
* The engine mounting nuts are self-locking.
* Once the nut has been removed, it is no longer of any use. Be sure to use new nuts, and then tighten them
to the specified torque.
Install the engine sprocket
1
with drive chain, and then install
the snap ring
2
.
"
ITEM N
·
m
kgf-m
lb-ft
A
100 10.0 72.5
B
60 6.0 43.5
C
60 6.0 43.5
D
35 3.5 25.5
PartShark.com
877-999-5686

Table of Contents

Other manuals for Suzuki LT-Z90

Related product manuals