EasyManua.ls Logo

Synesso MVP Hydra - Electrical Requirements; Voltage, Amp Ratings, and Wire Colors

Synesso MVP Hydra
13 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.5
The “puck temp” line has been removed
2.6
Steam tank fill delay setting has been relocated to this screen
2.8
Power save mode “start” and “end” time have been changed to “cool down” and “heat up” time to reduce
confusion
Changed the screen that appears while power save mode is active to show the heat up time

Other manuals for Synesso MVP Hydra

Related product manuals