EasyManua.ls Logo

Tait TB9100 - 1 Replacing the Network Board; Equipment Required

Tait TB9100
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TB9100 Reciter Service Manual Replacing the Network Board 13
© Tait Electronics Limited January 2006
1 Replacing the Network Board
This section describes how to troubleshoot and replace a faulty reciter
network board. Servicing procedures for the reciter digital board and the
reciter RF board are covered in the TB8100 Service Manual.
1.1 Equipment Required
Anti-static work environment
PC with Ethernet cable.
Torque screwdriver (4.5in-lbs) with Torx T-10 bit
TB9100 subrack (PA not required)
Figure 1.1 Network Board
DSP LED
flexible
connector
bridge
board
locating
pins
PowerPC LED
Activity LED Tx LED 1PPS coaxial cable

Other manuals for Tait TB9100

Related product manuals