102 Replacing Modules TB9100/P25 CG/P25 TAG Installation and Operation Manual
© Tait Limited March 2014
Notice Do not force the system control bus behind the reciter handle
as this may damage the ribbon cable.
If you need to remove any front panel cables, simply pull the front of the
cable retaining clip down and then slide it out from the subrack until it
reaches the end of its travel.
3. Tighten the nut on the SMA connector to a torque of 5lbf·in
(0.6N·m).
4. Refit the control panel, as described in “Replacing the Control
Panel” on page 98.
5. Carry out the instructions in “Final Reassembly” on page 115.