EasyManuals Logo

Takeuchi TB175W User Manual

Takeuchi TB175W
221 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #93 background imageLoading...
Page #93 background image
91
OPERATION
Operating Procedures
Leveling
1. Bring the hoe attachment close to the
body.
2. Gradually remove the dirt from the side of
the mound.
3. Once the mound is low, remove the dirt
from the top. If the load on the body is
too heavy, adjust by raising or lowering the
dozer blade.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Takeuchi TB175W and is the answer not in the manual?

Takeuchi TB175W Specifications

General IconGeneral
BrandTakeuchi
ModelTB175W
CategoryExcavators
LanguageEnglish

Related product manuals