OPERATION
Operating Procedures
Operations Possible with this
Machine
Excavating
2-Piece Boom
Mono-Boom
1. Set the dozer blade on the side opposite
the side you want to dig on and dig it
slightly into the ground.
2. Use the arm and bucket and dig with
shallow, long strokes. The digging force is
strongest when the boom and arm angle
is 80 to 120°. Use this angle for effective
digging.
Digging Ditches
Mount a bucket suited for digging ditches and
set the tires parallel to the ditch to be dug for
greater efciency.
When digging wide ditches, dig the sides rst,
the center later.
Digging Side Ditches
Use the boom swing function to dig side
ditches as shown in the diagram.
Loading
When loading dirt in a truck, starting from
the back of the trucks bed makes for easier
loading and increases the amount of dirt that
can be loaded.
Also, use a small slewing angle for greater
efciency.
W2E024
W2E025
W2A026

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Takeuchi TB175W and is the answer not in the manual?

Takeuchi TB175W Specifications

General IconGeneral
BrandTakeuchi
ModelTB175W
CategoryExcavators
LanguageEnglish

Related product manuals