EasyManua.ls Logo

Takeuchi TB53FR - OPERATION

Takeuchi TB53FR
447 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MACHINE CONFIGURATION
SLEW SYSTEM
III-9 TB53FR
SLEW SYSTEM
DISASSEMBLY AND ASSEMBLY
Removing the Slew Motor
1. Tilt up the floor frame.
2. Loosen the drain plug and drain the hydraulic
tank.
“Replacing hte Hydraulid Oil”
3. Disconnect the hydraulic hoses (1), the low pres-
sure hose (2) and control cables from control
valve (3).
Attach ID labels to the various hoses for when
reassembling them.
4. Disconnect the hydraulic hoses (4) from shuttle
valve (5).
Attach ID labels to the various hoses for when
reassembling them.
5. Remove the bolts from bracket (6).
6. Remove the control valve and the shuttle valve
together with bracket (6).
7. Disconnect 6 hydraulic hoses from the slew mo-
tor (7).
8. Remove the slew motor fixing bolts (8).
Bolt: 256 ±12.7 N·m
Apply thread lock to the bolts.
9. Suspend the slew motor (7) and remove it.
Slew motor: 56 kg
Installing the Slew Motor
Follow the same procedure as for removal in the
reverse order.
J1C202
2
1
6
3
5
4
J1C203
5
7
8

Table of Contents

Other manuals for Takeuchi TB53FR

Related product manuals