EasyManua.ls Logo

Takeuchi TB53FR - Handling in Cold Weather

Takeuchi TB53FR
194 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
83
OPERATION
Operating Procedures
Leveling
1. Bring the hoe attachment close to the
body.
2. Gradually remove the dirt from the side of
the mound.
3. Once the mound is low, remove the dirt
from the top. If the load on the body is too
heavy, adjust by raising or lowering the
dozer blade.
E4D053

Table of Contents

Other manuals for Takeuchi TB53FR

Related product manuals