TECDrive TEC-3 User Guide Revision 1.20
6
www.tecmotors.co.uk/tecdrive
1
Quick Start Up
1.2. Quick Start Process
Step
Action
See Section
Page
1
Identify the Enclosure Type, Model Type and ratings of
your drive from the model code on the label. In particular
- Check the voltage rating suits the incoming supply
- Check the output current capacity meets or exceeds
the full load current for the intended motor
2.1
Identifying the Drive by Model Number
8
2
Unpack and check the drive. Notify the supplier and
shipper immediately of any damage.
3
Ensure correct ambient and environmental conditions for
the drive are met by the proposed mounting location.
9.1
Environmental
27
4
Install the drive in a suitable cabinet (IP20 Units) ensuring
suitable cooling air is available. Mount the drive to the
wall or machine (IP66).
3.1
3.3
3.4
3.5
3.6
General
Mechanical Dimensions and Mounting IP20 Open Units
Guidelines for Enclosure Mounting IP20 Units
Mechanical Dimensions IP66 (Nema 4X) Enclosed Units
Guidelines for mounting (IP66 Units)
9
9
9
10
5
Select the correct power and motor cables according to
local wiring regulations or code, noting the maximum
permissible sizes
9.2
Rating Tables
27
6
If the supply type is IT or corner grounded, disconnect the
EMC filter before connecting the supply.
9.5
EMC Filter Disconnect
28
7
Check the supply cable and motor cable for faults or short
circuits.
8
Route the cables
9
Check that the intended motor is suitable for use, noting
any precautions recommended by the supplier or
manufacturer.
4.10
EMC Compliant Installation
15
10
Check the motor terminal box for correct Star or Delta
configuration where applicable
4.5
Motor Terminal Box Connections
13
11
Ensure suitable wiring protection is providing, by installing
a suitable circuit breaker or fuses in the incoming supply
line
4.3.2
9.2
Fuse / Circuit Breaker Selection
Rating Tables
13
27
12
Connect the power cables, especially ensuring the
protective earth connection is made
4.1
4.2
4.3
4.4
Connection Diagram
Protective Earth (PE) Connection
Incoming Power Connection
Motor Connection
12
12
13
13
13
Connect the control cables as required for the application
4.6
4.10
7
7.8
Control Terminal Wiring
EMC Compliant Installation
Analog and Digital Input Macro Configurations
Example Connection Diagrams
14
15
23
25
14
Thoroughly check the installation and wiring
15
Commission the drive parameters
5.1
6
Managing the Keypad
Parameters
16
17
1.3. Installation Following a Period of Storage
If the drive has not been powered, either unused or in storage, the DC Link Capacitors require reforming before power may be connected to the
drive. Refer to your local sales partner for information regarding the correct procedure.