EasyManua.ls Logo

TECE Uni - Installation

Default Icon
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-11
Installation
Installation
Shell installation
The corner valve of the cistern is closed and pre-installed
as a complete unit. The pressure test can be carried out
without having to open the cistern. The cistern only needs
to be opened during the fine installation phase. During the
shell construction stage, the cistern remains sealed. An
unbroken seal during fine installation work guarantees that
the cistern is clean and functional. A damaged seal shows
that the cistern has already been opened.
Splash guard with seal
Fine installation
The cistern can only be opened if the seal on the splash
guard is broken. If the seal is untouched for fine installa-
tion, the inside of the cistern is dirt-free and intact.
The connection pipe must be flushed properly before the
cistern is put into operation. To do this, the hose can be
lead out of the cistern towards the outside. After being
flushed out, the reinforced hose can be screwed onto the
filling valve without the need for any tools.
A special feature of the TECE cistern is the actuation block
mounted on the splash guard. When the cistern is opened,
it is completely removed. This also works with the support
frame for the actuation.
Splash guard with actuation block
Despite the small inspection opening, there is sucient
space for work inside the cistern. The operating levers are
shaped in such a way that they find their own way into the
drawbar eyelets of the drain valve when inserted.

Related product manuals