Do you have a question about the Techfrost E Series and is the answer not in the manual?
Defines the intended use and limitations of the blast chiller freezer.
Details the technical specifications and unique features of the blast chiller.
Outlines the testing process before dispatch and final certification.
Lists relevant European Directives and standards the chiller conforms to.
Specifies requirements for the installation site and customer responsibilities.
Provides contact information for post-sale technical assistance.
General warnings and precautions for performing regular maintenance work.
Instructions for cleaning the interior and accessories of the chiller.
Details the procedure and importance of cleaning the condenser.
Steps to take when the chiller is not in use for an extended period.
Guides users on identifying and resolving common, simple malfunctions.
Provides information on waste disposal regulations (WEEE, RoHS) and symbols.
Describes materials used in product contact zones and refrigerant type.
Outlines basic safety standards and potential risks related to the chiller's construction.
Specifies the ideal location requirements for the chiller, considering ventilation and space.
Instructions for safely connecting the chiller to the power supply.
Tips for optimizing chilling and freezing cycles, including pre-cooling and core probe use.
Steps for preparing the chilling chamber and factors affecting chilling/freezing rates.
Recommends performing a defrost cycle before switching off the unit.
Details the function of each button on the control panel.
Explains the different working states of the device and power interruption handling.
Step-by-step guide for turning the blast chiller on and off.
Instructions on how to manually initiate a defrost cycle.
Procedure for locking and unlocking the control panel keyboard.
Guide for setting the real day and hour on the device.
Lists the available functioning types and general pre-cycle procedures.
Detailed instructions for performing a blast chilling cycle and subsequent conservation.
Specific steps for executing a hard blast chilling cycle and conservation.
Instructions for carrying out a blast freezing cycle and its conservation phase.
Guide for performing a soft blast freezing cycle and its conservation.
How to initiate the pre-cooling phase before other cycles.
Procedure for verifying the correct insertion of the core probe for temperature cycles.
Explains the HACCP function and provides a chart of memorizable HACCP alarms.
How to display and interpret HACCP alarm information.
Steps to cancel or clear HACCP alarm logs.
Information on changing machine parameters and factory settings.
Explains the meaning of the various LED indicators on the control panel.
Provides a chart explaining the meaning of instruction codes like "Loc" and "UnL".
Lists and explains alarm codes (tiME, AL, AH, id) and their remedies.
Lists and explains error codes (Pr1, Pr2, Pr3) related to probe and evaporator issues.