Sub-menu for: 
•  Generator assignment (single or multi stage generator)  
•  Setting the minimum runtimes 
•  Assigning the generator sequence  
•  Selecting the generators for automatic generator change 
•  Difference in hours run for generator change  
➢  The delays for individual stages start running with the first activation of a stage. 
➢  Generator  sequence  for  multi  stage  boilers:  the  stages  following  the  1st  stage  are 
subsequently added to the generator sequence.  
Example: with a 3-stage boiler A, if generator A1 is 3rd in the sequence (= 1st boiler stage), 
then boiler stages A2 and A3 come 4th and 5th.  
➢  Conditions for generator change: 
o  If there are 2 or more generators, the change must be approved. 
o  Every 10 minutes, the system checks whether the generator sequence should be 
changed. 
o  If the difference in hours run is greater than the set differential, the change will be 
carried out, provided that the generators affected by the change are either all ON or 
all OFF. 
o  If the difference in hours run is greater than twice the set differential, the change will 