➢ If a higher cascade stage is switched on before the lower stages, all preceding stages will
be switched on as well, subject to the delay. In other words, if only stage 4 switches on,
stages 1 – 4 will be switched on.
➢ The stage is switched on immediately if the delay of a cascade stage has already expired
when that stage is switched on.
➢ The parameter menu provides the option of resetting the hours run meters, individually or all
together.
➢ PLEASE NOTE: The meter readings of the hours run meters are saved to the internal
memory every hour. Therefore, in the event of a power failure, no more than 1 hour of
metering can be lost.
➢ When loading function data, you will be asked whether you want to apply the saved meter
readings (see manual Programming Part 1: General information).