EasyManua.ls Logo

Tek-Air VorTek VT-7000 series - Page 22

Default Icon
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22VORTEK Doc.# VT5 OM 050499, Rel. 2.1
Appendices Appendix A
Engineering Department
43 Beaver Brook Road
Danbury, CT 06810
(203) 791-1400 Phone
(203) 798-6534 Fax
VorTek
Revision Letter: A
Index No: 1-2
Revision Date: 12/6/96
Filename: T-VT5200B.CDR
Drawn By: GV
Airflow Measuring Probes
Installation Drawing
Rectangular Duct Insertion Probes
CROSS SECTION
MOUNTING ACROSS WIDTH
#10 TEK
SCREW
MOUNTING
INSERTION SIDE
AIRFLOW
AIRFLOW
RECEIVING SIDE
MOUNTING
3 3/4" DIA HOLE IN
DUCTWORK FOR
INSERTION OF PROBE
MOUNTING PLATE
BOTTOM OF DUCT
TOP OF DUCT
5/16" DIA. HOLE TO
RECEIVE PROBE SUPPORT
END
FOR QTY. OF SENSORS
PER PROBE SEE SCHEDULE
(TYPICAL)
H
W
5/16" THREADED ROD
WITH JAM NUTS
(PROVIDED)
SENSOR ENCLOSURE AND
CONNECTION CABLE
RECEPTACLE
4" x 4"
(WITH INTEGRAL GASKET)
W
INLET VIEW
H
A1
A2
A3
A4
A1
A2
A3
A4
TYPICAL SENSOR
SHEDDER BAR
SHROUD
SENSOR CLAMP
PROBE BAR
FOR APPLICABLE
HOLE LOCATIONS
SEE SCHEDULE.
FOR QTY. OF PROBES
SEE SCHEDULE
A1
A2
A3
A4
SEE NOTE 4
NOTES:
1. INSTALL IN ACCORDANCE WITH AIRFLOW DIRECTION
INDICATOR.
2. FOR QTY. OF PROBES & SENSORS PER PROBE, SEE SCHEDULE.
3. FOR UNITS WITH 2 PROBES, USE LOCATIONS A1 & A3 ONLY.
4. PROBES 14" LONG OR LESS ARE CAPPED WITH NO STUDS OR
NUTS PROVIDED. IN THIS CASE, NO (5/16") HOLE SHOULD
BE DRILLED.
CROSS SECTION
MOUNTING ACROSS HEIGHT
INLET VIEW
A
A
SLOT IN ROD TO BE
ALIGNED WITH AIRFLOW
DIRECTION
SECTION A-A
PROBE ALIGNMENT SLOT
REQ'D FOR ALL BARS
Selection of Materials For Construction
Aluminum
& ABS
CPVC
& ABS
304 St Steel High Temp.
St. Steel
A-3

Related product manuals