Technology Solutions
Instruction Manual
Tek-Flux 1400A
www.tek-trol.com
3 Installation
This section covers instructions on installation and commissioning. Installation of the
device must be carried out by trained, qualified specialists authorized to perform such
works.
CAUTION
• When removing the instrument from hazardous processes, avoid direct
contact with the fluid and the meter
• All installation must comply with local installation requirements and local
electrical code
3.1 Correct Mounting Point
• Correct mounting point is important for the installation of a flow meter. Wrong
point may influence measuring accuracy or flow meter service life, or even
damage the flow meter.
• The axis for measuring electrode shall be approximate to horizontal direction.
(Angle with horizontal line shall be no more than 10°)