Performance ver
ification
Performance v
erification
NOTE. The performance verification procedure is not a calibration procedure. The performance verification procedure
only verifies that your instrument meets key specifications. For your instrument to be calibrated, it must be returned to
a Tektronix se
rvice facility.
Prerequisi
tes
Thetestsinthissectionmakeupaconfirmation of performance and functionality when the following requirements are met:
The SignalVu-PC application must be version 3.11 .0x or greater.
Operate the instrument in an environment that meets the temperature, altitude, and humidity characteristics listed in
the specifications.
The instrument must be completely assembled and covers installed per factory specification.
The instrument must have been operating for a warm-up period of at least for 30 minutes (after being connected to the
PC, starting the SignalVu-PC application, and SignalVu-PC is connected to the RSA306B instrument and continuously
acquiring data).
NOTE. The RSA306B does not fully power on until SignalVu-PC has established communication with the RSA306B
and is acquiring data.
The instrument must have had its last alignment routine done after at least a 30 minute warm–up period at an ambient
temperature not more than ±2 °C different than the current ambient temperature.
12 RSA306B Specifications and Performance Verification