Temp-Cast 2000 Installation Manual February 2010
2
TABLE OF CONTENTS
SECTION1 – INTRODUCTION
PAGE #
General Information 3
Site Preparation 3
Clearances 3
The Façade 4
Delivery & Handling 4
Tools 4
Additional Materials 4
Combustion Air Supply 5
SECTION 2 – CHIMNEYS & DAMPERS
General Requirements 6
Flue Connections 6
Masonry Chimneys 6
Factory-built Chimneys 7
Base-Exit Dampers 8
Installing the Roof-top Chimney Damper 9
SECTION 3 - STEP-BY STEP ASSEMBLY
Assembly Notes 10
Step-by-Step Installation 11
SECTION 4 - DOOR FRAMES & FACADE
The Door Frame Flange 37
Installing Arched Fire-Box Doors 38
Air Supply Doors 42
Clean-out (Soot) Doors 42
Installing "See-Through" Doors 43
Installing Square Fire-Box Doors 44
Installing Bake Oven Doors 46
The Trim Plate Option 47
Installing the Facade 48
The Masonry Cap 49
SECTION 5 - AVOIDING INSTALLATION ERRORS
50
SECTION 6 – CERAMIC FIBRE CUTTING PLAN
51
SECTION 7 –WARRANTY
53