EasyManua.ls Logo

Temp-Cast 2000 - Page 41

Default Icon
53 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 4 – Installation of Door Frames & Facades
Temp-Cast 2000 Installation Manual
41
ARCHED FIRE DOORS - Step Three
Continue with the masonry facade, up to the
level of the first permanent bolt attachment.
Insert the four permanent bolts into the
frame.
Chip or cut the brick or other masonry, so
that a cavity is created around the area of the
bolt. (Refer to plan-view illustration, Fig.
15)
Continue raising the facade, filling the space
around the bolt with mortar, tight to the
"coreflex" spacer.

Other manuals for Temp-Cast 2000