Do you have a question about the Tennant 7 and is the answer not in the manual?
Steps to prepare the machine before installing the kit, including draining tanks and disconnecting components.
Reference diagram and routing instructions for the ec-H2O wire harness installation.
Steps for connecting the LED light and assembling the instrument panel components.
Reconnecting panel components and replacing the steering wheel during harness installation.
Routing main and negative stand-off wires to the control board area.
Laying the machine on its side to access and install the pump assembly.
Routing harness connectors and securing the ec-H2O pump assembly to the machine.
Cutting the hose plug and connecting the solution hose to the ec-H2O pump.
Routing the ec-H2O pump solution hose towards the scrub head area.
Installing hose support brackets at each motor hub location on the scrub head.
Removing screws and mounting the ec-H2O module assembly to the machine frame.
Connecting solution hoses and ec-H2O harness wires to the ec-H2O module.
Connecting the solution hose from the ec-H2O module to the solution hose manifold.
Installing cover bracket and applying foam adhesive strips to the seat panel.
Re-installing the seat panel, reconnecting harness, and battery tray.
Steps to view and set the machine configuration via the indicator lights.
Running the self-test mode by pressing specific buttons and turning the key.
Connecting bypass tool, filling tank with water, and checking for leaks.
Entering manual mode, verifying water output, and performing a final leak check.
Verifying cartridge manufacture date and filling the installation date on the label.
Removing plugs and connecting the green hoses to the water conditioning cartridge.
Setting the timer by pressing service and solution flow buttons on the ec-H2O module.
Applying the new ec-H2O NanoClean labels to the machine using tick-marks for alignment.
Diagram showing the ec-H2O wire harness layout and specific connection points.
Loading...