Adjustment
47
13
.05.14 Thread check spring
Requirement
The movement of thread check spring
2
the material (approx. 7 mm spring path).
Adjust stop 1 (screw 2) according to requirement.
To adjust the pressure of the spring, turn screw 3 (screw 4).
Due to technical reasons, the length of the thread-check spring path can vary a
little in either direction.
Fig. 13 - 14
3
1
2
4
Texi HD Forte UF instruction manual