BHT-206A/B-SERIES-MM-1
5-00-00
Export Classification C, ECCN EAR99
GROUND RUN
GROUND RUN OF HELICOPTER TO BE
ACCOMPLISHED BY QUALIFIED PERSONNEL
ONLY.
Chapter 12 1. Make sure applicable servicing requirements have been
carried out.
2. Check oil level of transmission, hydraulic tank, engine, and
tail rotor gearbox prior to running helicopter.
3. Make sure that helicopter is ready for ground run and that
surrounding area is clear.
BHT-206A-FM-1,
BHT-206B-FM-1,
BHT-206B3-FM-1
4. Start the helicopter and conduct ground run at 100% N
R
to
check for leaks, and ensure all systems are operational, and
parameters are within Flight Manual limitations.
5. Shut down the helicopter.
5-22. 300-HOUR AIRFRAME PROGRESSIVE INSPECTION — EVENT NO. 2 (CONT)
DATA REFERENCE INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
30 APR 2013 Rev. 14 Page 63/64