10 Bleeding and filling
1. Open all radiator valves fully.
2. Start the heat pump.
3. Listen for air in the system.
4. Refill the heating system to a pressure of min. 1 bar.
5. Repeat the procedure until all air has been removed.
Commissioning iTec
Thermia Värmepumpar VIJSR102
43