INDEX
1.1 GENERAL PRECAUTION
1.2 INSTALLATION
A. STANDARD INSTALLATION
B. DIMENSION CHART
C. Components of installation
D. Installation of articulated arm opener
E. Wire Connection
F. Emergency Release
G. Photocell Installation
H. Green Box Installation
I. Power Supply Connections
2. CB19 Control Box
2.1 LED Indication
2.2 Transmitter Memorizing and Erasing Process
2.3 System Learning Process
2.4 Gate Operation
2.5 Gate-Moving Logic
2.6 Checking the Gate Mevements
3. Function Setting
3.1 Function of the LED Display
3.2 Photocell Adjustment
4. Trouble Shooting
5. Technical Features
A. Dimension
B. Technical Feature:
6. Maintenance
1
2
2
2
3
3
4
5
5
6
6
7
10
10
10
11
11
11
11
11
12
13
13
13
14
14