GC-35 Setup
First Time Setup
2
P/N: 1001548-01
First Time Setup
1. Mount the Control Box onto the bracket.
2. Connect the Sensor Cables and the Power Cable to the Control Box.
3. Power on the Control Box. See “Powering the Control Box On/Off” on page 2.
4. Set the Valve Offsets from the Performance Menu. See “Setting Valve Offsets (Raise and Lower) for Paver” on page 7.
or See “Setting Valve Offsets (Raise and Lower) for Profiler” on page 10.
Powering the Control Box On/Off
Power On/O
Button
Startup Screen Shutdown Screen
GC-35
Shutting Down
Cong File Name
cong: 15
Machine Type