EasyManua.ls Logo

Toro 04616 - Setup; Installing the Front Roller; Installing the Hoop Link, Offset Link or Chain Link

Toro 04616
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setup
MediaandAdditionalParts
Description
Qty.
Use
Ballstud2Mounttoroller
Operator’sManual
1
Readbeforeinstallingandoperatingcuttingunit
Partscatalog1
Usetoreferencepartnumbers
Certicationofcompliance
1
1
InstallingtheFrontRoller
NoPartsRequired
Procedure
Thecuttingunitisshippedwithoutafrontroller.Install
therollerusingtheloosepartssuppliedwiththecutting
unitandinstallationinstructionsincludedwiththeroller.
2
InstallingtheHoopLink,Offset
LinkorChainLink
NoPartsRequired
Procedure
Forcuttingunitsthatwillbemountedonatractionunit
withaserialnumberpriorto240000001,theproperlift
linkmustbeobtainedandinstalled.
TheHoopLink,partNo.105-5740and(2)capscrews,
partno.323-6arerequiredforinstallationonthe
Greensmaster3000,3000-D,3050,3100,3150and
3150-Qtractionunits.
Installthehooplinktothetopofthecuttingunitwith
(2)capscrews.Torquethecapscrewsto25-30ft-lbs.
(34-40N-m)(
Figure3).
g014745
1
Figure3
1.Hooplink
TheOffsetLink,partNo.110–2397and(2)capscrews,
partno.323-6arerequiredforinstallationonthe
Greensmaster3250-Dtractionunits.
Installtheoffsetlink(
Figure4)tothetopofthecutting
unitwith(2)capscrews.Torquethecapscrewsto
25-30ft-lbs.(34-40N-m).Theoffsetlifthookshould
positionedwiththehookforward.
4

Related product manuals