EasyManua.ls Logo

Toro 25500 - Page 66

Toro 25500
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D.Openthedrainvalveanddrainthecleaning
solutionintoadrainpan(Figure98andFigure
100).
E.Closethedrainvalve(Figure100).
2.Flushthecoolingsystemasfollows:
A.Fillthecoolingsystemwithcleanwater(Figure
103).
Figure103
1.Fillerneck(recoverytank)3.Cleanwater
2.Funnel
B.Operatetheenginefor5minutesoruntilthe
coolanttemperatureinthecommand-center
displayindicates82°C(180°F),thenstopthe
engine.
CAUTION
Thewaterishotandcancauseburns.
Stayawayfromthedischargeendofthe
coolantdrainhose.
C.Openthedrainvalve(Figure100)anddrainthe
waterintoadrainpan.
D.Ifthewaterdrainedfromtheradiatorisdirty,
performsteps2-Athrough2-Cuntilthewater
drainedfromtheradiatorisclean.
E.Closethedrainvalve(Figure100).
FillingtheSystemwithCoolant
Thecoolantcapacityoftheengineandtheradiator:18.5
L(19.5USqt).
Important:Fillthecoolingsystemproperlytoprevent
airlocksinthecoolingpassages.Failingtoventthe
coolingsystemproperlycandamageboththeengine
andthecoolingsystem.
1.Removetheradiatorcapfromtherecoverytank
(Figure97).
2.Fillthecoolingsystemwiththespeciedcoolant
mixture(Figure104)untiltheuidlevelisuptothe
midpointinthesightgauge(Figure97).
Figure104
1.Coolantlevel(midpointin
thesightgauge)
3.Coolant(amixtureof50%
ethyleneglycoland50%
water)
2.Funnel
3.Installtherecovery-tankcap(Figure97).
4.Starttheengineandrunitathalfthrottlefor5minutes.
5.Stoptheengineandremovethekey.
6.Wait30minutes,thenchecktheuidlevelinthe
recoverytank.Ifitislow,addcoolant.
7.Closethereservoirdoorandsecureittothehoodwith
the2hex-headbolts(Figure97)thatyouremovedin
step2ofDrainingtheCoolantfromtheSystem(page
64).
8.Installthesidepanels;refertoInstallingtheSidePanels
(page45).
66

Table of Contents

Related product manuals