Groundsmaster 3500Cutting Decks Page 8 − 18
Cutting Deck Carrier Frame
1. Front carrier frame
2. Rear carrier frame
3. Lynch pin
4. Thrust washer
5. Pivot pin
6. Grease fitting
7. Front right lift arm
8. Front left lift arm
9. Rear lift arm
10. Latch rod
11. Latch tube
12. Hardened washer
13. Cap screw
14. Pop rivet
15. Rod clip
16. Cap screw
17. Cap screw
18. Rebound washer
19. Cap screw
20. Grease fitting
21. Pop rivet
22. Wear strip
23. Deck motor
24. Foot guard
25. Flange bushing
26. Cap screw
27. Hardened washer
28. Flange nut
29. Cap screw
30. Flat washer
31. Flange nut
32. Cap screw
33. O−Ring
Figure 19
FRONT
RIGHT
7
17
5
3
6
15
14
10
11
12
13
16
8
1
6
19
18
17
9
22
21
2
4
1
3
3
4
4
5
5
20
23
30
29
31
24
32
25
26
27
28
33
Each cutting deck is suspended from a carrier frame.
The cutting deck carrier frame is attached to the lift arm
and allows the cutting deck to pivot on the lift arm pivot
shaft.
Carrier frames are secured to the lift arm pivot shaft with
a lynch pin. The front cutting decks are pushed by the
traction unit and have a thrust washer between the carri-
er frame and the lift arm. The rear cutting deck is pulled
by the traction unit and has a thrust washer between the
carrier frame and the lynch pin.