6
FILLING OUT WATERING SCHEDULE FORM
VALVE NUMBER
In the area at the top of the form, fill in the area 
and/or type of lawn or garden which is to be 
watered by each Valve. In the example, three of 
the valves are watering turf (lawn), two are 
watering flowers and one is watering vegetables.
WATERING DAYS
For each Program (1 to 6), write in the days of 
the week that watering is required (eg. Mon, 
Wed, Fri), or the interval between waterings (eg. 
3 days – water every third day), or Odd or Even 
if restricted watering is imposed, based on your 
house number.
RUN TIME (minutes)
For each of the Programs and each of the
Stations, write in the Run Time required. Run 
time can be set to any time between 1 minute 
and 12 hours and 59 minutes.
START TIME
Write in the Start Times for each of the six 
Programs. Each program can have up to six 
assigned start times.
Sample Six Station Watering Schedule Form