EasyManua.ls Logo

Toro TRX-250 - Trencher Maintenance; Replacing the Digging Teeth; Checking and Adjusting the Digging Chain and Boom

Toro TRX-250
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TrencherMaintenance
ReplacingtheDigging
Teeth
ServiceInterval:Beforeeachuseordaily—Check
theconditionofthediggingteeth
andreplaceanythatarewornor
damaged.
Duetothehighamountofwearplacedonthedigging
teeth,youwillneedtoreplacethemperiodically.
Toreplaceasingletooth,removetheboltssecuring
thetoothtoremoveit,theninstallanewtoothinthe
sameposition.Torquetheboltssecuringtheteethto
37to45N∙m(27to33ft-lb).
CheckingandAdjustingthe
DiggingChainandBoom
ServiceInterval:Every25hours
Checkeachlinkinthechainforexcessivewear,
suchaslinksthatcannolongerholdteeth.
Inspectthebottomoftheboomforwear.
Withthetrencherboomparalleltotheground,
ensurethatthereare3.8to6.3cm(1-1/2to2-1/2
inches)betweenthebottomoftheboomandthe
topofthebottomchainspan.Ifnot,adjustthe
chaintension.
Important:Donotovertightenthechain.
Excessivechaintensionmaydamagedrive
components.
Toreplaceawornchain,iporreplaceaworn
boom,oradjustthechaintension,usethefollowing
procedure:
1.Parkthemachineonalevelsurface,engagethe
parkingbrake,andlowertheboom.
2.Shutofftheengineandremovethekey.
3.Ifyouarereplacingthechainorippingor
replacingtheboom,completethefollowing:
A.Removethe2boltsandnutssecuringthe
boomtothetrencherarm(Figure62).
g287009
Figure62
1.Bolts
2.Jamnut
3.Adjustingbolt
B.Loosenthejamnutontheadjustingboltin
theboom.
C.Loosentheadjustingboltuntilyoucan
removethechainfromtheboom.
D.Removethechainfromthedrivesprocket.
E.Ifthechainneedsreplacing,removethe
boltandnutsecuringthespoilsaugerand
removetheaugerandchain.
F.Removetheboom,ipitoversothebottom
becomesthetop(orifyouhavealready
ippeditonce,replaceit),andinstallthe
boomagain.
G.Replacethenuts,bolts,andwashersto
securetheboom.
H.Ifyouareinstallinganewchain,connect
thelinksbypressingorhammeringthe
clevispinsuppliedwiththechainthrough
thelinks,thensecuretheclevispinwiththe
cotterpinsuppliedwiththechain.
Important:Toavoidbendingthechain
links,placeblocksunderandbetween
thelinkswhenhammeringtheclevispin
through.
I.Installthechainoverthedrivesprocketand
frontroller.
J.Ifyouremovedthespoilsauger,install
itusingtheboltandnutyouremoved
previously.T orquetheboltandnutto102
N∙m(75ft-lb).
K.Skiptostep6tocompletetheadjustment.
4.Loosenthe2boltsandnutssecuringtheboom
tothetrencherarm
5.Loosenthejamnutsecuringtheadjustmentbolt.
6.Turntheadjustmentboltinoroutasneededto
achievethedesiredtension.
7.Tightenthejamnut.
44

Table of Contents

Related product manuals