Toro TRX-250 - Replacing the Drive Sprocket

Toro TRX-250
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.Torquethe2boltsandnutssecuringtheboom
to183to223N∙m(135to165ft-lb).
ReplacingtheDrive
Sprocket
Overtime,thedrivesprocketwears,especiallywhen
itisusedinsandyorclaysoils.Whenthishappens,
thediggingchainbeginstoslip.Ifthechainslips,
replacethedrivesprocketasfollows:
1.Parkthemachineonalevelsurface,engage
theparkingbrake
2.Raisethetrencherafewinchesabovethe
ground.
3.Shutofftheengineandremovethekey.
4.Removethespoilsauger(Figure63).
g007842
Figure63
1.Spoilsauger
2.Bolts
3.Drivesprocket
4.Sprocketmountingsurface
5.Loosenthe2boltsandnutssecuringtheboom
tothetrencherarm.
6.Loosenthejamnutontheadjustingboltinthe
boom.
7.Loosentheadjustingboltuntilyoucanremove
thechainfromtheboom.
8.Removethechainfromthedrivesprocket.
9.Removethe6boltssecuringthedrivesprocket
(Figure63).
10.Removeanddiscardthedrivesprocket(Figure
63).
11.Cleanthesprocketmountingsurfaceonthe
trencher(Figure63).
12.Slidethenewsprocketontotheshaft(Figure
63).
Important:Thearrowonthesprocketface
shouldbevisiblefromtherightsideof
thetrenchandshouldpointinaclockwise
direction;ifnot,turnthesprocketaround.
13.Threadthe6boltsintothesprocketngertight
(Figure63).
14.Slowlybegintighteningtheboltsprogressing
aroundthesprocketuntilallboltsaretorquedto
129to155N∙m(95to115ft-lb).
Important:Tighteneachboltonlyhalfway
rst,workingyourwayaroundthe6bolts,
thenreturntoeachboltinturnandtorque
them
15.Loopthechainovertheaugerdriveshaftand
ontothedrivesprocket,ensuringthattheteeth
pointforwardontheupperspan.
16.Settheupperspanofthechainintoplaceon
thetrencherboom,thenwrapthechainaround
therollerattheendoftheboom.
17.Threadtheadjustmentboltintotheboomand
turnitinuntilthereis3.8to6.3cm(1-1/2to2-1/2
inches)ofslackinthechainonthebottomspan.
18.Threadthejamnutdowntheadjustingboltand
tightenitsecurelyagainsttheboom.
19.Torquethe2boltsandnutssecuringtheboom
to183to223N∙m(135to165ft-lb).
20.Installthespoilsaugerusingtheboltandnut
youremovedpreviously.
Note:T orquetheboltandnutto102N∙m(75
ft-lb).