Workman HD Series
Page 6 -- 62
Drive Train
8. Install PTO intermediate shaft sub--assembly:
A. If removed during disassembly, insert bearing
(item 3) into PTO housing.
B. Put gear (item 2) on mating gear.
C. Move gear until bores of gear and bearing line up.
D. Insert intermediate shaft s ub--assembly (item 1).
Apply grease to intermediate shaft to aid assembly.
9. Insert PTO shaft assembly (item 1) into bearing
housing of PTO housing.
3
Figure 140
1
2
Figure 141
1
Figure 142