EasyManua.ls Logo

Toshiba e-studio 167 - Mixed-Size Original Copying

Toshiba e-studio 167
268 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
e-STUDIO167/207/237 © 2007 - 2008 TOSHIBA TEC CORPORATION All rights reserved
GENERAL OPERATION
4 - 2
4.2 Description of Operation
4.2.1 Warming-up
1) Initialization
Power ON
Heater lamp ON
“Please wait” is displayed
Fan motors ON
Initialization of scanning system
- The CIS unit moves to the home position.
- The CIS unit moves to the peak detection position.
- The LED of CIS is turned ON.
- Peak detection (white color is detected by the shading correction plate)
- The LED of CIS is turned OFF.
- The CIS unit moves to the home position.
“READY (WARMING UP)” is displayed
2) Pre-running operation (Only when the temperature is at 16 °C or less)
The pre-running operation is started when the temperature of the fuser roller surface reaches a cer-
tain temperature.
The main motor is turned ON
- Fuser roller rotated.
- Drum rotated.
Pre-running operation stops after 15 seconds
3) When the surface temperature of the fuser roller becomes sufficient for fusing,
“READY” is displayed
4.2.2 Ready state (ready for copying)
Buttons on the control panel enabled
When no button is pressed for a certain period of time,
- Set number “1” is displayed. Equipment returns to the normal ready state.

Table of Contents

Other manuals for Toshiba e-studio 167

Related product manuals