4 P9 ASD Quick Start Guide
Installation Precautions
Location and Ambient Requirements
The TIC ASD is intended for permanent installations only.
Installation should conform to the National Electrical Code — Article 110 (NEC) (Requirements
For Electrical Installations), all regulations of the Occupational Safety and Health
Administration, and any other applicable national, regional, or industry codes and standards.
Note: For ALL references to the National Electrical Code (NEC), see the latest release of
the National Electrical Code.
Select a mounting location that is easily accessible, has adequate personnel working space, and
adequate illumination for adjustment, inspection, and maintenance of the equipment (refer to the
NEC Article 110-13).
DO NOT mount the ASD in a location that would produce catastrophic results if it were to become
dislodged from its mounting location (equipment damage or injury).
DO NOT mount the ASD in a location that would allow it to be exposed to flammable chemicals or
gases, water, solvents, or other fluids.
Avoid installation in areas where vibration, heat, humidity, dust, fibers, metal particles, explosive/
corrosive mists or gases, or sources of electrical noise are present.
The installation location shall not be exposed to direct sunlight.
Allow proper clearance spaces for installation. Do not obstruct the ventilation openings. Refer to
the section titled Installation and Connections on pg. 10 for further information on ventilation
requirements.
The ambient operating temperature range of the P9 ASD is 14° to 104° F (-10° to 40° C).
Mounting Requirements
•Only Qualified Personnel should install this equipment.
Install the unit in a secure and upright position in a well-ventilated area.
As a minimum, the installation of the equipment should conform to the NEC — Article 110
(NEC), OSHA, as well as any other applicable national, regional, or industry codes and standards.
Installation practices should conform to the latest revision of NFPA 70E Electrical Safety
Requirements for Employee Workplaces.
It is the responsibility of the ASD installer/maintenance personnel to ensure that the unit is installed
into an enclosure that will protect personnel against electric shock.
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www .ctiautomation.net - Email: info@ctiautomation.net

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Toshiba P9 ASD and is the answer not in the manual?

Toshiba P9 ASD Specifications

General IconGeneral
BrandToshiba
ModelP9 ASD
CategoryInverter
LanguageEnglish

Related product manuals