EasyManua.ls Logo

Toshiba P9 ASD - Volts per Hertz Setting (F015); Command Source (F003)

Toshiba P9 ASD
105 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
P9 ASD Quick Start Guide 23
Startup and Test
Before turning on the ASD ensure that:
R/L1, S/L2, and T/L3 are connected to the 3-phase input power.
U/T1, V/T2, and W/T3 are connected to the motor.
The 3-phase input voltage is within the specified tolerance.
There are no shorts and all grounds are secured.
All personnel are at a safe distance from the motor and the motor-driven equipment.
Use the following table to record any changed parameters for future reference.
Table 3. ASD Parameter Changes by Installer/Maintenance Personnel.
ASD ID__________Name:______________________Date:_______ Notes
Parameter
Number
Parameter Name
Default or
Previous
Setting
New Setting
Unit of
Measure
Note: Settings may also be recorded via Program
Utilities
Type Reset
Save User Settings.
DANGER
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www .ctiautomation.net - Email: info@ctiautomation.net

Table of Contents

Related product manuals