7. Loop the 3 Black Resistance Bands over the Slotted Axle with 3 Pulley Wheels
(see 10 below).
8. Hook Resistance Bands onto Resistance Band Hooks (see 11 above).
Important: Before hooking the Bands, ensure that they are underneath the
Stabilizer Bracket (not over it - see 10 above). Also, ensure that the Bands are not
crossed (see 12 above).
9. Assemble the Leg Extender by inserting the Upper and Lower Roller Pipes into
the Leg Extender holes. Then slide the corresponding Upper and Lower Foam
Rollers over the respective Roller Pipes.
Important: The larger Foam Roller must be fitted to the longer Upper Roller Pipe.
Stabilizer Bracket
Upper
Lower
Hook
10 11 12
6