EasyManua.ls Logo

TOTAL FLEX L - Fitting New Resistance Bands

TOTAL FLEX L
23 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fitting New Resistance Bands.
1. Insert the new Resistance Band through the Swivel
Pulley bracket (see 1).
2. Loop the band around the first and then the second
Pulley Wheel and hook onto the Pod Hook.
(see 2 & 3).
3. If necessary, proceed by replacing the other
Resistance Bands, fitting one at a time.
4. Screw the two Power Pod Covers back together
starting with the two centre holes
(see 4 & 5).
3 4 5
1
2
19