EasyManua.ls Logo

TP-Link SG6654X - Page 17

TP-Link SG6654X
37 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Omada Stackable L3 Managed Switch
13Installation
Before installing the device in an EIA standard-sized, 19-inch rack, please check the efficiency of
the grounding system and the stability of the rack, then wear an ESD-preventive wrist strap, and
make sure that it has good skin contact and is well grounded. Bracket B & C have two adjustable ears,
please measure the distance between the front-post rack and the rear-post rack, and determine a
suitable mounting method from below:
Method Demonstration
Rack Distance
(For device
with a depth of
380mm)
Rack Distance
(For device
with a depth of
420mm)
Rack Distance
(For device
with a depth of
460mm)
Front:
Bracket D
Rear:
Bracket A (Screw Hole
Group 1) + Bracket B (Ear
towards back)
498-640mm 538-680mm 578-720mm
Front:
Bracket D
Rear:
Bracket A (Screw Hole
Group 1) + Bracket C (Ear
towards back)
477-498mm 517-538mm 557-578mm
Front:
Bracket D
Rear:
Bracket A (Screw Hole
Group 2) + Bracket C (Ear
towards back)
429-477mm 469-517mm 509-557mm
Front:
Bracket D
Rear:
Bracket A (Screw Hole
Group 2) + Bracket C (Ear
towards front)
410-429mm 450-469mm 490-509mm
Front:
Bracket D
Rear:
Bracket A (Screw Hole
Group 3) + Bracket C (Ear
towards back)
357-410mm 397-450mm 437-490mm
Front:
Bracket D
Rear:
Bracket A (Screw Hole
Group 2) + Bracket B (Ear
towards back)
282-410mm 322-450mm 362-490mm

Related product manuals