WSHP-SVX11E-EN 25
Pre-Start Checklist
Before energizing the unit, the following system devices
must be checked:
Is the high voltage power supply correct and in
accordance with the namepla
te ratings?
Is the field wiring and circu
it protecti
on the correct
size?
Is the low voltage control circuit wiring correct per the
unit
wiring diagram?
Is the piping system clean/complete and correct? (A
reco
mmendation of all system flushing of debris from
the water-to-refrigerant heat exchanger, along with air
purging from the water-to-refrigerant heat exchanger
be done in accordance with the Closed-Loop/Ground
Source Heat Pump Systems Installation Guide).
Is vibration isolation provided? (i.e. unit isolation pad,
hose kits)
Is unit serviceable? (Allow a 12-inch clearance at the
unit front for servi
ceab
ility).
Are the low/high-side pressure temperature caps
secure and in
place?
Are all the unit access panels secure and in place?
Is the thermostat in the OFF position?
Is the water flow establish
ed and circulating through
all the units?
Is the duct work correctly sized
, ru
n, taped, insulated
and weather proofed with proper unit arrangement?
Is the condensate line properly sized
, run, and pitched?
Is the zone sensor (when used) correctly wired and in
a good
location?
Does the indoor blower turn freely without rubbing?
Has all work been done in accordance with applicable
local and national codes?
Has heat transfer fluid been added in the proper mix to
pr
event freez
ing in closed system application?